Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
Full-Text Search:
Hongshui River
FQ: 双月
AD of Publication: 广西壮族自治区南宁市
Lanuage: 中文;
ISSN: 1001-408X
CN: 45-1146/TM
YP: 1982
Url: 广西水力发电工程学会;广西电力工业勘察设计研究院
Recommended Journals
Hongshui River
2009 -04
Catalog
Analysis on Precipitation Spatial-temporal Structure in the Upper Yellow River CHEN Xiao-hua1,ZHAO Xin2,WANG Jun1(1.Guangxi Electric Power Industry Investigation Design and Research Institute, Nanning 530023;2.Guangxi Communication Scientific Research Institute,Nanning 530007)
Structural Design and Application of Reinforced Earth Retaining Wall Based on DIBt Method JIN Yan-li,HUANG Xiao-hua(Guangxi Electric Power Industry Investigation Design and Research Institute,Nanning 530023)
General Layout Design for Construction of Letan Hydropower Station LIN Qiang-guang(Guangxi Electric Power Industry Investigation Design and Research Institute,Nanning 530023)
Overview on Design of Energy Dissipation and Erosion Control for Release Sluice of Qiaogong Hydropower Station XU Ting-lan,LUO Bing-zhu(Guangxi Electric Power Industry Investigation Design and Research Institute,Nanning 530023)
Engineering Design and Operation Management of Aggregate Processing System at Jinjitan Hydro Project HUANG Feng-xiang(Guangxi Juneng Hydropower Development Co.,Ltd,Nanning 530022)
Design and Construction of Revetment for Main Works of Changzhou Hydraulic Complex XU Xian,LI Ri-feng(Guangxi Changzhou Hydropower Development Co.,Ltd,Wuzhou 543002)
Design and Application of Steel-framed Concrete Jumbo BO Ying-bin,JIA Gao-feng,ZHANG Xu-zhang(Sinohydro Bureau 3 Co.,Ltd,Xi'an 710016)
RCC Engineering Technique Applied to Intake Section of Longtan Hydropower Station LIANG Chong-ning(Guangxi Tian'e Urban-rural Construction Investment Co.,Ltd,Tian'e 547300)
Test Study on Water Diversion and Sediment Control for Convex Bank of Wanao Hydropower Station XU Jie1,DAI Guang-qing1,YANG Qing1,LUO Tao2(1.State Key Laboratory of Hydraulics of Sichuan University,Chengdu 610065;2. Sichuan Investigation Design and Research Institute of Water Resources and Hydropower,Chengdu 610072)
Numerical Analysis on Reservoir Water Temperature of Gelantan Hydropower Station MA Mei-ying,WANG Li-cheng,GUO Xiao-xuan,ZHAO Xiao-na(China Water BEIFANG Investigation,Design & Research Co.Ltd,Tianjin 300222)
Analysis on Stress and Deformation of Jinping Ⅰ High Arch Dam after Foundation Reinforcement HU Zhu-xiu1,ZHANG Jian-hai1,ZHOU Zhong2,RAO Hong-ling2(1.State Key Lab of Hydraulics and Mountainous River Engineering, College of Water Resources and Hydropower,Sichuan University,Chengdu,610065;2.Chengdu Hydroelectric Investigation and Design Institute,CHECC,610072)
Test Study and Prevention of Concrete's Alkali-silicon Reaction for Allai Khwar Hydropower Project in Pakistan QIN Ding-bin(Guangxi Hydroelectric Construction Bureau,Nanning 530001)
Sensitivity Analysis on Impervious System of an Engineering Dam Foundation LI Jing-qi(Guangxi Electric Power Industry Investigation Design and Research Institute,Nanning 530023)
Treatment against Concrete Slab Fissure on Dam of Dongba Hydropower Station LONG Han(Guangxi Baise Electric Power Co.,Ltd,Baise 533000)
Research on the Air-void System Test Method against Air-entrained Concrete ZHANG Hui,GAO Pei-wei,SHI Nan-nan(Civil Engineering Department of Nanjing University of Aeronautics and Astronautics,Nanjing 210016)
Water Turbine Design for Hydropower Station with High Water Head in Sedimentladen River SU Xiang-yun,WEN Lan-guan(Nanning Generating Equipment General Works,Nanning 530031)
General Layout Design for Bajiangkou Hydropower Station in the Guijiang River of Guangxi ZHOU Wan-wen(Guangxi Investigation and Design Institute of Water Conservancy and Electric Power,Nanning 530023)
Design of Large Pump House for Coastal Power Plant WEN Jun-chao(Guangxi Electric Power Industry Investigation Design and Research Institute,Nanning 530023)
Design and Operation of Ash Handling System of Guigang Power Plant Phase I Project TAN Zhen-yun(Guangxi Electric Power Industry Investigation Design and Research Institute,Nanning 530023)
Type Selection and Arrangement of 110kV HV Distribution Device for Shanxiu Hydropower Station in the Zuojiang River of Guangxi ZHOU Rui-xiang,LIU Ai-mei(Nanning Institute of Water Conservancy and Hydro-Power Design,Nanning 530001)
Application and Analysis of Injection-type Stator Earth Fault Protection for Large Hydroelectric Unit LING Hong-zheng1,HAN Hai-yan1,CHEN Jia-sheng2,ZHANG Qi-xue2(1.Longtan Hydropower Development Co.,Ltd,Tian'e 547300;2.NARI Relay Electric Co.,Ltd,Nanjing 211106)
Application of EN8000 Vibration Monitoring and Fault Diagnosing System to Qinzhou Power Plant QIN Gang(Guangxi Electric Power Industry Investigation Design and Research Institute,Nanning 530023)
Analysis on Application of WAsP to Wind Energy Resource Assessment for Sige Wind Farm in Guizhou LAI Yong-lun1,WU Qing2(1.Shenzhen Boda Coal Power Development Co.,Ltd,Shenzhen 518034;2.Hydrochina Guiyang Engineering Corporation,Guiyang 550081)
Engineering Cost Control at Stage of Power Transmission Line Design for Rural Power Grid Construction and Modification MO Xun-hua,HOU Yan-qiao(Guangxi Guidong Electric Power Co.,Ltd,Hezhou 542800)
Application of Execution Estimate to a Project WU Yu-sheng(Guangxi Electric Power Industry Investigation Design and Research Institute,Nanning 530023)
Great-leap-forward Development of Electric Power in Guangxi LU Ding-guo(Guangxi Power Grid Corporation,Nanning 530023)
Design of Land Requisition and Resettlement Program for Nam Tha 1# Hydropower Station in Laos QIN Yuan-yi(Guangxi Electric Power Industry Investigation Design and Research Institute,Nanning 530023)
2009 Issues:  [01] [02] [03] [04] [05] [06]
More Issues:   [1994]   [1995]   [1996]   [1997]   [1998]   [1999]   [2000]   [2001]   [2002]   [2003]   [2004]   [2005]   [2006]   [2007]   [2008]   [2010]   [2011]   [2012]   [2013]   [2014]   [2015]   [2016]   [2017]
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved