Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
Full-Text Search:
Hongshui River
FQ: 双月
AD of Publication: 广西壮族自治区南宁市
Lanuage: 中文;
ISSN: 1001-408X
CN: 45-1146/TM
YP: 1982
Url: 广西水力发电工程学会;广西电力工业勘察设计研究院
Recommended Journals
Hongshui River
2009 -05
Catalog
Diversion Work Design and Analysis on Investment Ratio between Diversion Work and Main Work of Shaqian Hydropower Station on the Furong River in Guizhou WEN Cai-xue1,WU Kai-long2(1.Guizhou Qianxinanzhou Industrial Investment Company,Xingyi 564200;2.Guizhou Investigation Design & Research Institute of Water Conservancy & Hydropower,Guiyang 550002)
Research on Environmental Risk of Large Water Conservancy and Hydropower Project HUANG Han-qiu(Guangxi Electric Power Industry Investigation Design and Research Institute,Nanning 530023)
Study on How Sediment Deposition of Xinjin Reservoir on the Yujiang River Affects Water Intake of Nanning Power Plant LU Hang-bo(Guangxi Electric Power Industry Investigation Design and Research Institute,Nanning 530023)
High Pressure Jet Grouting and Anti-seepage Engineering at Cofferdam of Power House at Taipingjiang Hydropower Station HUANG Feng-mei(Guangxi Hydroelectric Construction Bureau,Nanning 530001)
Concrete Temperature Control Technology Applied to Double-curvature Arch Dam of Baotan Hydropower Station WEI Guo-ling,LIAO Zu-chao(Guangxi Hydroelectric Construction Bureau,Nanning 530001)
Study on Transport of Groundwater of Jinping Cascade Ⅱ Hydropower Station with Long Diversion Tunnel ZHANG Ji-un1,REN Xu-hua1,SHU Jia-qing2,SHAN Zhi-gang3(1.College of Water Conservancy & Hydropower Engineering,Hohai University,Nanjing 210098;2.Jiangsu Electric Power Design Institute,Nanjing 211102;3.East China Investigation and Design Institute,Hangzhou 310014)
Waterway Flushing Test on Overall Hydraulic Model for Letan Hydropower Station JIANG Ming-xin,LI Ye-jian(Guangxi Hydropower Research Institute,Nanning 530021)
Test Study on Flow Conditions at Water Intake of Power Station at Shihutang Navigation-power Junction ZHOU Jia-yu1,YIN Chong-qing1,WANG Zhao-bing1,WU Men-wu2(1.Chongqing Southwestern Hydraulic Engineering Research Institute for Waterway,Chongqing 400016; 2.Scientific Research Institute of Pearl River Water Resources Commission,Guangzhou 510611)
Long-term Runoff Forecast Based on Support Vector Machine ZHAO Hong-biao,WU Yi-bin(Longtan Hydropower Development Limited Liability Company,Nanning 530000)
Back Calculation and Distribution Features Study of Ground Stress Field for Hydropower Project in Yunnan WAN Guo-rong(Guangxi Electric Power Industry Investigation Design and Research Institute,Nanning 530023)
Safety Monitoring Index of Horizontal Displacement of Mianhuatan Dam LIU Bei-bei1,2,ZHENG Fu-gang1,2,ZHANG Lan1,2(1.College of Water Conservancy & Hydropower Engineering,Hohai University,Nanjing 210098;2.National Engineering Research Center of Water ResourcesEfficient Utilization & Engineering Safety,Nanjing 210098)
Stability Analysis of Cable-crane Platform Slope on Left Bank of Dagangshan Hydropower Station LI Lin1,TIAN Yuan2,TAO Xiong3(1.Jiangxi Provincial Water Conservancy Planning and Designing Institute,Jiangxi 330029;2.The Seventh Engineering Bureau,China Water Conservancy and Hydropower,Chengdu 611730;3.Yunnan Amojiang Power Generation Co.,Ltd,China Guodian,Kunming 650021)
Research on Latest System of Eurocodes TAO Hong-hui(Guangxi Electric Power Industry Investigation Design and Research Institute,Nanning 530023)
Brief Introduction of Smooth Transition from Project Construction to Production of Longtan Hydropower Station CHU Yue-ting,WANG Peng-yu(Longtan Hydropower Development Co.,Ltd,Tian'e 547300)
Review on Hydraulic Characteristic Curve of Dahua Hydropower Station QIN Jun(Guangxi Electric Power Industry Investigation Design and Research Institute,Nanning 530023)
Study of Prediction on Feedback Calculation of Excavated Monitor to Xiluodu Underground Powerhouse HAN Rong-rong1,ZHANG Jian-hai1,ZHANG Xiao1,JIANG Feng2,LI Jie2,ZHANG En-bao2,HOU Pan2(1.State Key Laboratory of Hydraulics and Mountain River Engineering,Chengdu 610065;2.Chengdu Hydroelectric Investigation & Design Institute of CHECC,Chengdu 610072)
Analysis on Black Start at Longtan Hydropower Station YANG Xing-fu(Guangxi Longtan Hydropower Development Co.,Ltd,Tian'e 547300)
Study on Mode of Access System at Pumped-storage Station ZUO Zheng-min1,LIU Yun2(1.Guangdong Power Grid Corporation,Guangzhou 510600;2.Guangdong Electric Power Design Institute,Guangzhou 510063)
Technical Transformation to Working Seal of Turbine Main Shaft for 1# Unit of Xijin Hydropower Plant YANG Xian-qian(Guangxi Xijin Hydropower Plant,Nanning 530325)
Study on Dust Suppression and Wind-proof Wall at Coal Yard of Thermal Power Plant HE Xian-feng,TANG Zhi(Guangxi Electric Power Industry Investigation Design and Research Institute,Nanning 530023)
Study on Long-term Resettlement Compensation Due to Land Acquisition of Water Conservancy and Hydropower Project Construction ZENG Fan-liang,YE Fa-yong(Guangxi Electric Power Industry Investigation Design and Research Institute,Nanning 530023)
Evaluation on Effect of Funds Allocation for Follow-up Support to Resettlement for Reservoir Construction YU Wei-feng(Guangxi Power Industry Investigation Design and Research Institute,Nanning 530023)
Principles and Method of Settlement for Dispute on Ownership of Inundated Land at Trans-province Reservoir Area ZHANG Man-guang(Guangxi Youjiang Water Development Co.,Ltd,Baise 533000)
Topographic Mapping Technique Based on Airborne Laser Radar Data HUANG Jia-wu(Guangxi Electric Power Industry Investigation Design and Research Institute,Nanning 530023)
Discussion on Status Quo and Developing Trend of Substation Automation System of County-level Power Enterprise TANG Yi-na(Daxin Water Resources & Electric Power Ltd.,Daxin 532300)
Developing Trend of Substation Online Monitoring Technology XU Qing-chao(Guangxi Electric Power Industry Investigation Design and Research Institute,Nanning 530023)
Application of Safety and Stability Control Device to Longtan Hydropower Station on the Southern Power Grid HAN Hai-yan1,YU Hui-min1,SU Hua-li1,DING Xiu-li2(1.Longtan Hydropower Plant,Tian'e 547300;2.Xining Power Supply Bureau,Xining 810000)
Study on Operation Cost of Long-range High-Speed Belt Conveyor at Longtan Hydropower Station ZHU Xian-tu,SU Ming-xian(The Fifth Branch of Sinohydro Bureau 7 Co.,Ltd,Pengshan 620860)
2009 Issues:  [01] [02] [03] [04] [05] [06]
More Issues:   [1994]   [1995]   [1996]   [1997]   [1998]   [1999]   [2000]   [2001]   [2002]   [2003]   [2004]   [2005]   [2006]   [2007]   [2008]   [2010]   [2011]   [2012]   [2013]   [2014]   [2015]   [2016]   [2017]
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved