Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
Full-Text Search:
Boiler Manufacturing
FQ: 双月
AD of Publication: 黑龙江省哈尔滨市
Lanuage: 中文;
CN: 23-1249/TK
YP: 1979
Url: 哈尔滨锅炉厂有限责任公司
Recommended Journals
Boiler Manufacturing
2006 -01
Catalog
Efficiency Calculation of Cyclone of Fenyi 100 MW CFB Boiler Wang Zhiwei~1,Li Xiaofeng~2(1.Xi'an Thermal Research Institution Xi'an 710032;2.Huaneng International Electric Power Co.Ltd.Beijing 100031)
Rebuilding and improving of the anti-abrasion mechanism to 35 T/H circulating fluidized bed boiler Zeng Donghe~1,Liu Mingyun~2(1.Machinery & Energy Engineering Department,Shaoyang University,Hunan 422004;2.Heat-power plant,Fiber Nylon Co.Lt.,Hunan 419323,China)
Introduction of 100 MW CFB Boiler Operation in Fenyi Power Plant Sun Tao,Shu bo,Wang Zhiwei(1.Jiangxi fenyi Power Plant,Fenyi 336607,China;2.Guodian Thernal Research Institution,Xi'an 710032,China)
Analysis on Water Circulation Characteristic of 300MW "W" Flame Boiler Hao Lili,Liu Yunzhu(Harbin Boiler Co.,Ltd.,Harbin 150046,China)
Design Improvement Measure and Manufacturing Request of Steam Superheater Equipments Zhang Fujun,Zhang Mingbao(Harbin boiler Co.,Ltd.,Harbin 150046 China)
Introduction of Super Critical Once Through Boiler Start-up System Sun Hao,Yang Wengui Zhou FuGui(Harbin Boiler Co.Ltd Harbin 150046,China)
The Analysis of CFB Boiler Operation Liu Lizhi~1,Li Yingbin~2(1.Harbin boiler company limited,Harbin,Heilongjiang 150046;2.Dongfang boiler company limited,Zigong,Sichuan 643001
Retrofit of Superheat Steam Overtemperature and Combustion System Blockage for 35 t/h Boiler Dong Qingmei,Zhang Huaiyu(1.Harbin Boiler Co.Ltd.,Harbin 150046,China;2.Liaoning Electric Power Design Institution,Shenyang 110015,China)
Design of Rich-lean Coal Burner for 130t/h Boiler Liu Jianhua,Cang Fan(Harbin Boiler Co.,Ltd.,Harbin 150046,China)
Flow Field Optimization of the Gas Inlet of Heat Recovery Steam Generator Cui Chengyun,Meng Xiaodong,Duan Yuefei(Harbin Boiler Co.,Ltd Harbin 150046,China)
Experimental Study on factors affecting Desulfurizing Efficiency of Activated Carbon Zhang Yue~1,Yuan Bin~2,Yan Weiping~3,Cui Mingxian~1,Tian He~1(1.Automation and Energy College,Tianjin University of Technology, Tianjin 300191;2.Datang Panshan Power Co.Ltd.in Tianjin,301900;3.North China Electric Power University,Hebei,Baoding,071003)
Study of Methods for Controlling NO_x Emission in Thermal Power Plant Du Yaqin,Li Xinguo,Wu Ke(Zhengzhou electric power Senior College)
Corrosion and Protection for FGD equipment Yu Shu~1,Li Xiaoyu~2,Zhu Yue~2(1.Harbin Electric Power Engineering Co.Ltd Harbin 150046,China;2.Harbin Power Plant Equipment Corporation,Harbin 150046,China)
Applying Modern Design Method to Optimize FGD system Li Xiaoyu,Zhu Yue(Harbin Power Equipment Co.,LTD.Harbin 150046,China)
The design Method of the Form Plank Pressure Qu Yuchan,Yu Qifeng(Harbin Boiler Co.,Ltd.,Harbin 150046,China)
The Gap-bed Adaptor's Approximation Process Technology Equipment and Its Deviation Yu Guofeng,Huang Jian,Wu Yadong(NanTong Wanda Boiler Co.,Ltd.Nantong 226005,Jiansu)
Research on Flattening Test on Boiler Tube Wang Hong(Harbin Industrial Boiler company,Harbin 150046,China)
Boiler Design with Software of 3 Dimension CAD Jiang Hongyu,Liang Zhiwei,Meng Xiaodong(Harbin Boiler Co.Ltd,Harbin 150046,China)
Thinking on Safety of Internet Information Xiao Chengyu(Harbin Housing business Centre Harbin 150001 China)
Value of PDM System to Enterprise Cai Junying(Jiangxi Jianglian Energy & Environment Co.,Ltd.,Nanchang 330001,China)
HF Acid Chemical Clean for Once Through Boiler Yang Wengui,Sun hao,Zhou Fugui(Harbin Boiler Co.Ltd,Harbin 150046,China)
Brief Talk on Hot Water Boiler and Protection Measures of Power Failure Zhu Lizhen(Harbin Boiler Co.Ltd.,Harbin 150046,China)
The Compare and Analysis is of Valve Intensity Calculation Wang Min(HBC Valve Co.Ltd Harbin 150046,China)
Analysis on PDM Application and Practise Wang Jianxin,Qian Yu,Huang Jian(NanTong Wanda Boiler Co.Ltd,Nantong 226005,Jiangsu)
The Significance of Boiler Wind Speed On-Line Examination Tang Xinping~1,Xu ZhiWei~2(1.Harbin Boiler Co Ltd;Harbin 150046,China;2.Harbin Extra High Voltage Burea;Harbin 150090,China)
Cognition for Subjects Mentioned in Regulation on Special Equipments Safety Supervision Zhang Baobin(Harbin Boiler co.,Ltd.,Harbin,150046,China)
Disposal System of Mud Burning Liu Heli(Tangshan Xinde Boiler corporation,Tangshan 063000,China)
Application of Quality Cost in Enterprise Management Gu Changbo(Harbin Boiler Co.,Ltd,Harbin 150046,China)
Technical Reconstruction of CNC and Electrical System of a Horizontal Boring and Milling Machine Liang Yuhong(Harbin boiler Co.Ltd.Harbin 150046,China)
Research on Intelligent Decision-making Support System Jiang Yunchen(Harbin Boiler Co.Ltd.,Harbin 150046,China)
Brief Talk on Measures of Preventing Boiler Accidents Chen Li(Heilongjiang shipping Housing Management Centre,Harbin 150001,China)
Brief Discussion on Rebuild of Coal Gate in Reaprocating Grate Boiler Bai Wenfeng(Heilongjiang Mapping Office Logistics Management Center,Harbin 150086,China)
2006 Issues:  [01] [02] [03] [04]
More Issues:   [1998]   [1999]   [2000]   [2001]   [2002]   [2003]   [2004]   [2005]   [2007]   [2008]   [2009]   [2010]   [2011]   [2012]   [2013]   [2014]   [2015]   [2016]   [2017]   [2019]
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved