Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
Full-Text Search:
Boiler Manufacturing
FQ: 双月
AD of Publication: 黑龙江省哈尔滨市
Lanuage: 中文;
CN: 23-1249/TK
YP: 1979
Url: 哈尔滨锅炉厂有限责任公司
Recommended Journals
Boiler Manufacturing
2009 -01
Catalog
Analysis of Gas Gas Heater Technology Chen Guozhong(Harbin Boiler Co.Ltd.,Harbin 150046,China)
Forming Process Channel Steel Fore Shaft and Die Design Shi Kelun(Anshan boiler factory company,Anshan 114012,China)
How to Extend the Service Life of Wire Rope on Crane Zhao Dongpeng(Harbin Industrial Boiler Company.Harbin 150046,China)
Analysis and Prospect of Usage Situation of Forging Stock Material Surface Quality Cui Haihong(Harbin Boiler Co.,Ltd.Harbin 150046,China)
Experimental Study of Burning Brown Coal in A 300MW CFB Boiler Chen Hong,Chang Shuwen,Li Mingliang,Cao Xingwei,Qiu Yalin(Yun Nan Electric Power Test & Research Institute Group Co.Ltd.,KunMing 650051,China)
The Characteristic and Commissioning Technique of 1000MW Ultra-Supercritical Tower Type Boiler Ma Lixin(Jiang Su Fang tian Power Technology Co.Ltd.,NanJing 211102,China)
The Currently Main Technical Characters of 1000MW Ultra-supercritical Boiler Chen Hui,Wang Wenxiang,Yan Yi(Huaneng Power International,INC.Nanjing Jinling Power Plant Co.Ltd,Nanjing 210034,China)
The Operation of Opposed Firing Supercritical Boiler of HBC Sun Hongmin,Wu Lvchen(Harbin Boiler Co.Ltd.,Harbin 150046,China)
Erosion Analysis and Solution of CFB Boiler Heating Surface Sun Lixin,Wang Wenfeng,Ma Zhihong(ShanDong YanZhou Mineral Group NanTun Power Plant,Zhoucheng 273515,China)
Brief Introduction of Several Familiar Problems and Preventive Measures in CFB Boiler Design Operation Li Qiong,Zhu Juixi(HeBei HuaXin Boiler Group Co.Ltd.,JiNan 250031,China)
The Influencing Factors on Operating Stability of Air-water Ash Cooler Yang Wenbo,Liang Zhiwei,Cui Kai(Harbin Boiler Co.Ltd.,Harbin 150046,China)
Optimum Choice of Boiler Steel Structure Materials Wang Rong1,Fu Lina2(1.Harbin Boiler Co.Ltd;Harbin 150040,China;2.Heat&Power Co.,ltd,Mudanjiang 157000,China)
Design of Domestic First 300MW CFB Boiler Water Wall Liu Jianhong,lü Hong(Harbin Boiler Co.Ltd.,Harbin 150040,China)
The Manufacturing Technique of Spiral Rising Membrane Water Wall Panel Sun Hao(Harbin Boiler Co.Ltd.,Harbin 150046,China)
The Scheme and Improvement of 600MW Supercritical Whirl PC Burner Zhang Heai1,Zhang Meng2(1.Harbin Boiler Co.Ltd.,Harbin 150046,China;2.Harbin Engineering University,Harbin 150001,China)
Manufacture Technology of Blast Furnace Gas in Burner of fas-fired Coal-fired Boiler Liu Bin(Harbin Boiler Co.Ltd.,Harbin 150046,China)
Design Improvement of 220t Super High Pressure Oil-fired D-type Boiler Han Yunqi(Harbin Boiler Vessel Engineering Co.Ltd.,Harbin 150046,China)
Fan Selection when Boiler Operates in Tableland Area Liu Quan1,Zhou chunhai1,Zhang Meng2,Dong Peng3(1.Harbin Institute of Technology GeRui Enviromental Protection Energy technology Co.Ltd.,Harbin 150001,China;2.Harbin Engineering University,Harbin 150001,China;3.Harbin Institute of Technology Energy Science and Engineering Conservatory,Harbin 150001,China)
Non-Typical Combustion Problems Caused by Blockage in Air Preheater and Solutions Yang Tie,Liu Dafeng(Guizhou Nayong General Power Plant,Nayong 553300,China)
Analysis and Countermeasure on Primary Fan Surge for a Domestic 600MW Unit Yu Bin(Zhuhai Jinwan Power Plant,Zhuhai 519050,China)
The Research of 1000MW Ultra-supercritical HP Feedwater Heater Pan Zhuo,Tong Yan(Harbin Boiler Co.Lted.,Harbin 150046,China)
2009 Issues:  [01] [02] [03] [04] [05] [06]
More Issues:   [1998]   [1999]   [2000]   [2001]   [2002]   [2003]   [2004]   [2005]   [2006]   [2007]   [2008]   [2010]   [2011]   [2012]   [2013]   [2014]   [2015]   [2016]   [2017]   [2019]
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved