Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
Full-Text Search:
Boiler Manufacturing
FQ: 双月
AD of Publication: 黑龙江省哈尔滨市
Lanuage: 中文;
CN: 23-1249/TK
YP: 1979
Url: 哈尔滨锅炉厂有限责任公司
Recommended Journals
Boiler Manufacturing
2015 -01
Catalog
Quality Control for Hydrogenation Reaction Chamber Tong Duoguang;Li Hongfei;Jiang Nan;Harbin Boiler Co. ,Ltd.;
Analysis and Treatment on the Higher Hardness in T92 Weldment of Final- stage Reheater Duan Lidong;Wu Xian;Yang Quanming;Harbin Boiler Co. Ltd;
Discussion on Technical Proposal of Operating SCR System with all Load for 1000MW Ultra Supercritical Boiler Gao Wei;Song Baojun;Harbin Boiler Co. ,Ltd.;
Test Analysis for DN20; PN25 Spring Safety Valve by Hot Water and High Pressure at the Inlet of Medium Water Zhang Naibo;Wang tongdong;Wang zeqing;Muling city,Power-station valve Co. ,Ltd.;
Optimization Strategy of 660MW Ultra Supercritical Unit Heating Surface Temperature Excursion Xia Yongjun;Xia Meng;Xing Shuangxi;Wang Qian;Xiong Tihua;Jiangxi Provincial Electric Power Science Research Institute;Southern China branch. CRP;
Parameter and Steam Temperature Adjustment for the Boiler with Double Feheat Xia Liangwei;Harbin boiler co.,ltd.;
CFD on the New Type Subbituminous- burners of HBC Wang Tong;Wu Jiajie;Harbin Boiler Co. ,Ltd.;China Heilongjiang Longxing International Resources Development Group Co,. Ltd.;
Gas-steam Combined Cycle Heat Recovery Boiler Energy Efficiency Matrix Model Analysis Yan Shunlin;Zhang Zemiao;Yu Qunchao;Liu Zhiwei;School of Energy Power and Mechanical Engineering,North China Electric Power University;
Research and Analysis of Angle Welding Seam Split on the Water Wall Heater in a 600MW Supercritical“W”Shaped Flame Boiler Chen Yiping;Yu Pengfeng;Lv Dangzhen;Li Changsong;Hunan Electric Power Corporation Research Institute;Guodian Nanning Generation co.,LTD;
Analysis on Burned Primary Air Pipe in 4# Boiler of Guodian Suzhou Power Plant Cong Xingliang;Xie Hong;Yu Yongsheng;Anhui Electric Power Research Institute;
Burner Renovation of 300MW Coal- fired Boiler Liu Xiaotian;Cui Chengyun;Harbin Boiler Co. ,Ltd.;
The Differents of Supercritical Boiler Design Wang Jianping;Gao Yun;China's hydroponic Chongxin Power Generation Co. Ltd.;Harbin Boilor Co. ,Ltd.;
Analysis the reason of boiler extinguish when the unit running and treatment measures Zhan Shuxin;Zhang Tuo;Harbin Boiler Co. Ltd.;
Synopsis of Biomass Burning in Boiler Liu Jianhong;Harbin Boiler Co. ,Ltd.;
The Heating Surface Slag- Bongding Analysis of Power Station Boiler Zhang Tuo;Chang Le;Li Wei;Harbin Boiler Co. ,Ltd.;
Cause Analysis on the Burst and Leakage at the Linking Tube of Final Super-heater Outlet Header Wen Jili;Li Ying;Shanghai Institute of Special Equipment Inspection & Technical Research;Linde Engineering(Hangzhou) Co.,Ltd;
Operation Optimization Analysis of Induced Draft Fan and Booster Fan Gao Xiaochun;Zhao Hang;Luo Hong;Liu Haibin;Zhuang Wenjun;Guangdong Guohua Yudean Taishan Power Generation Co. ,Ltd;School of Energy and Power Engineering,North China Electric Power University;
The Application of MPS-HP-II Coal Mill in Generating Unit Burning with High Moisture Lignite
Technology of the Radiant Wast Heat Boiler in IGCC Liu Yinhe;Wu Yujun;Du Guozhu;Harbin Boiler Company limited;
The Tube-Expansion Disquisition of Non-corrosive Steel Tube of High Pressure Heater Zhang Xin;Cui Renshu;Yan Fang;Harbin Boiler Co. ,Ltd.;
2015 Issues:  [01] [02] [03] [05] [06]
More Issues:   [1998]   [1999]   [2000]   [2001]   [2002]   [2003]   [2004]   [2005]   [2006]   [2007]   [2008]   [2009]   [2010]   [2011]   [2012]   [2013]   [2014]   [2016]   [2017]
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved