Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
Full-Text Search:
Hydropower Automation and Dam Monitoring
FQ: 双月
AD of Publication: 江苏省南京市
Lanuage: 中文;
ISSN: 1671-3893
CN: 32-1641/TV
YP: 1977
Url: 英大传媒投资集团南京有限公司
Recommended Journals
Hydropower Automation and Dam Monitoring
2002 -06
Catalog
ANALYSIS OF DEVELOPMENT TREND OF COMPUTER MONITORING AND CONTROL TECHNOLOGY FOR HYDROPOWER PLANTS Shi Chong, Zhu Chen, Fang Huiqin, Huang Jian (Nanjing Automation Research Institute, Nanjing 210003, China)
APPLICATION OF TTS TO SPEECH ALARM SYSTEM OF HYDROPOWER PLANTS Zheng Lili 1, Li Zheng 1, Zhu Chen 2 (1. Donghua University, Shanghai 200051, China) (2. Nanjing Automation Research Lnstitute, Nanjing 210003, China)
MODEL-BASED FAULT DIAGNOSIS APPROACH FOR POWER UNIT OF EXCITATION CONTROL SYSTEM Xiao Zhihuai 1, Zhang Cheng 2 (1. Wuhan University, Wuhan 430072, China; 2. Fancuo Hydropower Station, Jiangle 353300, China)
A CONCISE WAY TO REALIZE REAL-TIME DATABASE OF THE EQUIPMENT FAULT DIAGNOSIS EXPERT SYSTEM FOR HYDROPOWER PLANTS Yang Tingyong, Shi Chong (Nanjing Automation Research Institute, Nanjing 210003, China)
APPLICATION OF MULTI-PATH ULTRASONIC FLOW MEASUREMENT TO VARIABLE-SECTION CONDUITS Xia Zhou 1, Zhao Xuedong 1, Liu Xiuliang 2, Bai Jiachong 3, Guo Shuhai 4 (1. Nanjing Automation Research Institute, Nanjing 210003, China) (2. Gansu Electrical Testing Institute, Lanzhou 730050, China) (3. North China Institute of Conservancy and Hydropower, Zhengzhou 450045, China) (4. Tianqiao Hydropower Station, Baode 036002, China)
APPLICATION OF STATIC FREQUENCY CONVERTER TO LARGE-SIZED PUMPED STORAGE POWER UNITS Wu Xianzhong, Wan Jingying (Wuxijiang Hydropower Plant, Quzhou 324000, China)
DESIGN OF DAM SAFETY MONITORING SYNTHETIC NETWORK SYSTEM FOR DANJIANGKOU DAM Wang Chao, Yao Fuhua, Wang Yingchun, Chen Huimin (Hanjiang Group Hydro Project Management Bureau, Danjiangkou 442700, China)
DISCUSSION ON THE PRECISION OF HEIGHT DIFFERENCE MEASUREMENT BY TOTAL STATION He Xiping (Nanchang College of Water Conservancy and Hydroelectric Power, Nanchang 330029, China)
LAYOUT AND INSTALLATION OF VERTICAL AND HORIZONTAL DISPLACEMENT METERS AT HONGJIADU HYDRAULIC POWER STATION Ning Guozhong, Wang Wei (The Second Branch of the No.1 General Team of the Armed police Bureau, Zhijin 551500, China)
ELECTROMAGNETIC DETECTION OF ANCIENT UNDERGROUND IRRIGATION AND DRAINAGE SYSTEM IN URBAN RAINFALL FLOOD UTILIZATION Fang Chungang, Jia Yongmei, Ke Zhiquan, Ge HuaiGuang, Lu Ying, Wang Huibin (China Institute of Water Resources and Hydropower Research, Beijing 100038, China)
ANALYSIS OF OBSERVED SEEPAGE DATA FOR WAN'ANXI CFRD Dai Miaolin 1, Guo Zhen 1, Wu Hongming 1, Hong Yun 2, Liu Zonghan 2 (1. Hohai University, Nanjing 210098,China; 2. Fujian Province Eletric Power Co Ltd, Fuzhou 350001, China) (3. Wan'anxi Hydropower Plant, Longyan 364000, China)
ANALYSIS OF PUMP STATION SAFETY MONITORING DATA FOR FIRST TRIAL OPERATION OF YELLOW RIVER DIVERSION PROJECT Li Qingmei (Shanxi Wanjiazhai Yellow River Diversion Project Administration Bureau, Taiyuan 030012, China)
APPLICATION OF ACTIVEX TO THE GRAPH FUNCTIONS OF RESERVOIR REGULATING AUTOMATION SYSTEM Li Chonghao, Chen Senlin(Wuhan University, Wuhan 430072, China)
STUDY ON THE AUTOMATIC CONTROL SYSTEM OF XINHUA SLUICE IN TANGSHAN Zhang Changfu, Hou Zhanhai, Li Yanhua (North China Institute of Water Conservancy and Hydroelectric Power, Zhengzhou 450045, China)
IMPROVEMENT OF WATER INTAKE GATE CONTROL SYSTEM OF GENERATING SETS AT WUXIJIANG HYDROPOWER PLANT Wu Jianchun, Jiang Zhizhao (Wuxijiang Hydropower Plant, Quzhou 324000, China)
REFORMATION OF COMPUTER CONTROL SYSTEM FOR CLOSURE OF LUBAO WATER GATE Pan Jinjiang (Lubao Sluice Administration Office of Beijiang River Dike Administration Bureau, Sanshui 528139, China)
APPLICATION OF MOBILE COMMUNICATION TECHNOLOGY TO XIAOLANGDI PROJECT Liang Hong, Xu Jiangping, Song Hongkuan (Yellow River Water Conservancy & Hydropower Development Corporation, Jiyuan 454681, China)
MANAGEMENT INFORMATION SYSTEM NETWORK OF FENGSHUBA HYDROPOWER PLANT Zhong Shengquan (Fengshuba Hydropower Plant, Longchuan 517300, China)
REFORM OF DC SYSTEM AT SHITANG HYDROPOWER STATION Zhou Fengxing, Ren Leming, Wu Jianxin, Shu Jinhong, Chen Nong (Jinshuitan Hydropower Station, Lishui 323600, China)
2002 Issues:  [01] [02] [03] [04] [05] [06]
More Issues:   [1998]   [1999]   [2000]   [2001]   [2003]   [2004]   [2005]   [2006]   [2007]   [2008]   [2009]   [2010]   [2011]   [2012]   [2013]   [2014]   [2015]   [2016]   [2017]   [2018]
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved