Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
Full-Text Search:
Insulators and Surge Arresters
FQ: 双月
AD of Publication: 陕西省西安市
Lanuage: 中文;
ISSN: 1003-8337
CN: 61-1129/TM
YP: 1958
Url: 西安电瓷研究所
Recommended Journals
Insulators and Surge Arresters
2011 -06
Catalog
Research on Transmission Line De-icing Method Based on High-frequency and High-voltage Excitation ZHOU Yu-sheng,CHEN Pei-yao,Gao Xiao-gang,HU Xin, SHI Fang-yuan,YANG Yi(College of Electrical Engineering and Information,Changsha University of Science and Technology,Changsha 410114,China)
The Brief Analysis of the Composite Insulators in Old Tunnels HE Qing-wen,ZHAN Tian-ren,HUANG Hui(Dongguan Gaoneng Electric Co.,Ltd.,Dongguan 523012,China)
Cause Analysis on a Rupture Accident of Stanchion Porcelain Insulators in 220 kV Isolating Switch WU Xu-tao1,WEI Peng2 (1.Ningxia Electric Power Research Institute,Yinchuan 750011 China;2.China Nation Centre for Quality Supervision and Test of Insulators and Surge Arrester,Xi'an 710077,China)
Research on the Entire Electric Field Distribution Characteristic of High-voltage Line Insulator for Large-scale Wind Farm ZHANG Qiang,WANG Wei-qing(College of Electrical Engineering,Xinjiang University,Urumqi 830047,China)
Simulation Research and Comparison on HHT and Fourier Transformation in Network Fault SONG Ming-ling1,ZHOU Li-xing1,DENG Yong2,HU Jing-tao1, (1.College of Electrical and Information Engineering,Changsha University of Science & Technology,Changsha 410014,China;2.Electric Power Company of Chongqing,Chongqing 400014,China)
Discharge Mode Recognition of Transmission Line Insulator Discharge based on Acoustic Emission LI Guang,WANG Cheng-jiang,HUANG Jin,ZENG Cong-hai,ZHANG Bo-ya(Institute of Engineering and Renewable Energy,Three Gorges University,Yichang 443002 China)
The Application of Lightning Location System's Statistical Data in the Analysis on Transmission Line's Insulation Lightning Protection Performance LIN Sheng-qiang1,WANG Ju-feng1,LI Ming-gui2,SHI Zhen-jiang3(1.College of Electrical Engineering,Guangxi University,Nanning 530004,China;2.Guangxi Power Grid Electric Power Research Institute,Nanning 530023,China;3.Fangchenggang Power Supply Bureau of Guangxi Power Grid,Fangchenggang 538001,China)
Analysis of the Lightning Accident of 220 kV Ma-mo Transmission Line and Counter Measures LI Zhi-qiang1,SUN Deng-min2,GE Guang-rui3,LI Chang-geng1,ZHANG Feng1(1.Shaoguan Electric Power Bureau,Guangdong Province,Shaoguan 512000,China;2.Department of Electrical Power Engineering,Changsha University of Science and Technology,Changsha 410077,China; 3.Power Supply Company of Heze,Heze 274000,China)
Anti-icing Flashover Research on Flower Arrangement Insulator and V-type Insulator String of Transmission Lines in Ice Area YAO Sen-jing1,PENG Xiang-yang1,SU Hua-feng2,JIA Zhi-dong2(1.Guangdong Electric Power Research Institute,Guangzhou 510600,China;2.Graduate School at Shenzhen,Tsinghua University,Shenzhen 518055,China)
Study on the Lightning Protection of 35 kV Transmission and Distribution Line CHEN Zhi1,TAO Feng-yuan2,ZHOU Feng1,ZHANG Xin1(1.College of Electrical & Information Engineering,Changsha University of Science and Technology, Changsha 410076,China;2.Luohe Electricity Power Supply Company,Luohe 462000,China)
Reason Analysis of Pollution Flashover of a 110 kV Transmission Line HE Yan-jiao,ZHANG Zhong-qiu,MA Li-shan,XU Shi-shan, BAO Zheng-hong,XIE Yan-li(Qinghai Electric Power Test & Research Institute,Xining 810008,China)
A Successful Application of the Live Detection Technology in the Diagnosis of Lightning Arrester State LUO Rong-bo,WANG Yan,LI Guo-wei(Foshan Power supply Bureau Guangdong Power Grid Corp,Foshan 528000,China)
Analysis on the Type Selection of Zinc Oxide Arrester of Medium Voltage Distribution Networks GUO Jian-wu(Deqing Electric Power Bureau,Deqing 313200,China)
Analysis on Defect Data of MOA in an Accident and Precautions YAO Ai-ming,XING Rong-xia(Lin'an Electric Power Supply Company,Lin'an 311300,China)
Research on Action Sensitivity of Discharge Counter for Surge Arrester CUI Long-yue1,GUO Jie1,YU Yong2(1.School of Electrical Engineering,Xi'an Jiaotong University,Xi'an 710049,China;2.Nanjing Electric(Group) Co.,Ltd.,Nanjing 210038,China)
Simulation Research on Eliminating Parallel Resistor in Circuit Breaker for 500 kV Transmission Lines Based on ATP-EMTP XU Peng1,LIN Bao-yu2,LIU Wei1,ZHANG Xin1,LEI Feng-rui1(1.Changsha University of Science & Technology,Changsha 410076,China;2.Anhui Huainan Pingwei Power Company Limited,Huainan 232089,China)
Improved Live Test Method for UHV MOA YUAN Hai-yan1,ZHUANG Yan-fei2,REN Qing-shuai2,YU Sha2,LI Kai2 (1.ShanDong Electric Power Research Institute,Jinan 250002,China;2.Extrahigh Power Subcompany of SEPCO.,Jinan 250021,China)
Influence of High Voltage DC Generator Current Limiting Resistor on MOA Test WU De-guan(Test & Maintenance Center of CSG EHV Transmission Company,Kunming 650000,China)
Determination of Metal Zinc in ZnO Raw Materials for Preparation of Metal Oxide Varistors by Anthraquinone Coloration Method LI Yue,WANG Lan-yi,XU Xue-ting(Nanyang Jinguan Electric Co.,Ltd.,Nanyang 473000,China)
Installation Scheme Study on Line Arrester of 220 kV Mianzi Line GUO Qing-tao LIAO Fu-wang HUANG Hai-kun(Fujian Electric Power Research Institute,Fuzhou 350007,China,)
Discussion on Correction of Transmission Line Lightning Trip-out Rate Based on Lightning Location Data LIU Gang1,TANG Jun1,ZHANG Ming2(1.School of Electric Power,SUCT,Guangzhou 510640,China;2.Foshan Power Supply Bureau of Guangdong Power Grid Corporation,Foshan 528000,China)
The Optimization Research of 500 kV MOA without Gap ZHANG Hong-tao,HE Ji-mou,ZHANG Hui-juan,WANG Ya-jing(Xi'an XD Arrester Co.,Ltd.,Xi'an 710200,China)
Study on the Relationship between the Discharge Characteristics and Voltage-current Characteristic and the Gap Characteristics of Arrester with Series Gaps ZHANG Qing-lei1,GUO Jie1,YU Fang2,JIN Qing2(1.School of Electrical Engineering,Xi'an Jiaotong University,Xi'an 710049,China;2.Xi'an Senior Electrical College,Xi'an 710032,China)
New Testing Methods for Arrester Resistive Current ZHANG Wei-ping(Dongguan Power Supply Bureau of Guangdong Power Grid Corporation,Dongguan 523000,China)
2011 Issues:  [01] [02] [03] [04] [05] [06]
More Issues:   [1999]   [2000]   [2001]   [2002]   [2003]   [2004]   [2005]   [2006]   [2007]   [2008]   [2009]   [2010]   [2012]   [2013]   [2014]   [2015]   [2016]   [2017]
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved