Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
Full-Text Search:
Power Equipment
FQ: 双月
AD of Publication: 上海市
Lanuage: 中文;
ISSN: 1671-086X
CN: 31-1391/TN
YP: 1987
Url: 上海发电设备成套设计研究院
Recommended Journals
Power Equipment
2001 -01
Catalog
Stable Combustion and Oil Saving Experience with Louver Type Horizontal Dense-Sparse Pulverized Coal Burners in 670 t/h Anthracite Boilers ZHANG Ji qiu, DU Guo hua, FU Qiang (Jiaozuo Power Plant, Jiaozuo Henan 454001)
Introduction of Retrofitting the Monotube Boiler into the Controlled Circulation One in Jianbi Power Plant SHAO Jia lin (Department of Boiler, Jianbi Power Plant, Zhenjiang Jiangsu 212006)
Front Wall Superheater Tube Fracture Accidents of Xiangfan Power Plant's No.1 & No.2 Boiler-Analysis and Remedy FANG Chong 1, CHEN Kun ming 2, YUAN Huai min 3 (1. Henan's Second Power Construction Co., Jiaozuo Henan 454100; 2. Henan Xinxiang Thermal Power Plant, Xixiang Henan 453000; 3. Huanen Yangluo Power Plant, Wuhan Hubei 430000)
Investigation of Water Wall Leakages of Pingwei Power Plant's No.1 Boiler YU Hong mei, TANG Bi guang (Faculty of Power, Wuhan University of Water Conservancy and Electric Power, Wuhan Hubei 430072)
An Experimental Study on the Shell Side Flow and Heat Transfer of Shell and Tube Type Heat Exchangers LI Hong feng 1, ZHOU Ming lian 2 (1. China University of Mining Technology, Beijing Campus, Beijing 100084; 2. M&E Engineering College of Northern Jiaotong University, Beijing 100044)
Optimized Retrofit of Dual Temperature and Double Separation Circulating Fluidized Bed Boilers DING Zhi ming (Shaoxin City's Thermal Power Plant, Shaoxin Zhejiang 312000)
On the Difference of a Governing System's Static Test and One with Turbine at Rest Performed on a N12-35 Type Steam Turbine TIAN Feng (Power Testing Institute of Guangdong Province, Guangzhou Guangdong 510600)
Development of Cogeneration Steam Turbines of the 100MW~300MW Class with Large Extraction Volumes YUAN Jian ping (Shanghai Steam Turbine Co. Ltd., Shanghai 200240)
Application of Chinese Visualized Manipulation Boards in PLC Boiler Control Systems ZHONG Zhao dong 1, GAO Hua 2 (1. Shenzhen Southern Information Enterprising Co, Shenzhen Guangdong 518067; 2. Xinjiang Kelamayi Petro Chemical Plant, Kelamayi Xinjing 834003)
Present Development State of Numerical Simulation of Flow and Heat Transmission KUANG Jiang hong 1, SHI Ping yang 2, DING Shi fa 2 (1. Department of Mechanical Engineering, Shanghai University of Engineering Science, Shanghai 200336; 2. Shanghai Power Equipment Research Institute, Shanghai 200240)
Reconstruction, Commissioning and Trial Operation of Oil Containing Sewage Disposing System GU Hua nian (Department of Steam and Gas Turbine, Shanghai Power Equipment Research Institute, Shanghai 200240)
Ways of Improving the Efficiency and Operational Economy of Power Plant Feed Water Pumps LI Gao 1, ZHANG Lin 2 (1. Power Plant Department, Jinan Coal Mining Design Institute, Jinan Shandong 250031; 2. Jinan College of Communication, Jinan Shandong 250031)
The Key-Technology in Realizing Localized Production of the Three Gorge's Sets WANG Xue qiang (Harbing Generator Co. Ltd., Harbing Helongjiang 150040)
Revised Standard GB 3087 and Problems to be Considered in the Application of Newly Edited Standards ZHANG Rui (Shanghai Power Equipment Research Institute, Shanghai 200240)
2001 Issues:  [01] [02] [03] [04] [05] [06]
More Issues:   [1999]   [2000]   [2002]   [2003]   [2004]   [2005]   [2006]   [2007]   [2008]   [2009]   [2010]   [2011]   [2012]   [2013]   [2014]   [2015]   [2016]   [2017]   [2018]
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved