Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
Full-Text Search:
Power Equipment
FQ: 双月
AD of Publication: 上海市
Lanuage: 中文;
ISSN: 1671-086X
CN: 31-1391/TN
YP: 1987
Url: 上海发电设备成套设计研究院
Recommended Journals
Power Equipment
2003 -01
Catalog
Retrofit of the Entering Primary Hot Air's Isolation Valves at Coal Mill's Entrance of Huaneng Fuzhou Power Plant's sets No.3 and No.4 WU Shixiang(Huaneng Fuzhou Power Plant, Changle, Fujian 350200, China)
Analysis of Overheater Explosion Accidents of a 225t/h-10.6MPa/535 Boiler at the Shanxi Fertilizer Plant WANG Yanlin(Repair Piece Department, Tianji Group, Lucheng, Shanxi 047507, China)
Addition of Vertical Water Cooled Pipes Raises the Coal Category Adaptability of Circulating Fluidized Bed Boilers ZHANG Lihua,YUAN Jinyu,ZHI Yuanzhen(Design Department, Jinan Boiler Group Co. Ltd., Yinan, Shandong 250023, China)
Application of the TD-40 Highly Efficient Energy Saving, Multi-Channeled, Long Necked Hydraulic Air Ejector of Niangziguan Power Plant's Set No.4 XU Shiwen1,XIE Dongjian2,LI Chunshen1,WU Dongwen2(1.Shanxi Niangziguan Power Plant, Yiangquan, Shanxi 045203, China; 2.Power Generation & Distribution Department, Shanxi Province Power Co., Shanxi 030001, China)
Diagnosis Analysis of the Vibration Problem of Shanghai Wujin Thermal Power Plant's Set No.12 ZHANG Qüanming(Equipment Department, Shanghai Wujin Thermal Power Plant, Shanghai, 200240, China)
Unusual Tooth Damages Occurring in the Main Speed Reduction Gearing of Dagang Power Plant's Coal Mills and the Problem's Solution ZHANG Shuming(Tianjin Dagang Power Plant, Tianjin, 300272, China)
Analysis Pertaining Failures of Electro-Hydraulic Control Systems of 300MW Steam Turbine Sets and Remedies WANG Hangzhou(Xiamen Songyu Power Plant, Xiamen, Fujian, 361026, China)
About the Application of Non-metallic Expansion Joints in Combined Cycle Waste Heat Boilers WANG Lixin,MA Dianhui,SUO Yuhui(Boiler Design & Development Department, Harbine Boiler Plant Co. Ltd., Harbine, Heilongjiang, 150046, China)
Quick Closing's Time Setting of a 135MW Set's Governing System YE Linhui(Guangdong Chuangcheng Power Engeneering Superintendence Co. Ltd., Guangzhou, Guangdong 510730, China)
On the Design of a Power Plant's Real Time Information System XU Jieyan1,ZHANG Xiaoyu2(1.Faculty of Power, Southeast University, Nanjing Jiangsu, 210096, China; 2.Siemens Power Plant Automatization Co. Ltd., Nanjing Jiangsu, 210008, China)
The Mini-Computerization of Data Acquisition and the Effective Load Control of Generators CHEN Nan(Cogeneration Power Plant of the Yangzi Petrochemical Co., Nanjing Jiangsu, 210048, China)
The Control System of Large Capacity Circulating Fluidized Bed Boilers ZHOU Shuiliang1,XIE Li1,YE Min2(1.Guangzhou Hengyun Power Plant, Guangzhou, Guangdong 510000, China; 2.Shanghai Xinhua Control Engineering Co. Ltd., Shanghai 200245, China)
A Power Plant Administration Training Simulator Soft Ware Based on Data Banks GUO Hui(Simulation Center, Yunnan Provincial School of the Electrical Industry, Kunming, yunnan, 650204)
R & D of City Waste Boilers XU Zhaokang(Environmental & Energy Engineering Faculty, Shanghai College of AppliedTechnology, Shanghai 200235, China)
Development and Key-Problems of Ultra Super-Critical Boilers HUANG Ying1,HUA Hongyuan1,LI Tao2,ZHANG Zhenxin2(1. Harbine Boiler Plant Co. Ltd., Harbine, Heilongjiang, 150046, China;2. Guohua Panshan Power Plant, Jixian, Tianjin, 301900, China)
About the Unification of the "Boiler Rules" and the "Electric Bioler Rules FU Chunxin,QU Guangyi(Harbine Boiler Works Co. Ltd., Harbine, Heilongjiang, 150046, China)
2003 Issues:  [01] [02] [03] [04] [05] [06]
More Issues:   [1999]   [2000]   [2001]   [2002]   [2004]   [2005]   [2006]   [2007]   [2008]   [2009]   [2010]   [2011]   [2012]   [2013]   [2014]   [2015]   [2016]   [2017]   [2018]
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved